" We are very pleased with the mist system you designed and installed into our wine storage facility. Storing 400,000 litres of wine ready for export, it is very important for us to have a cool environment and keep the temperature at the correct level. Your advice, recommendations and your team's professionalism and workmanship is second to none. You have exceeded our expectations and allowed us to maintain the quality of the wine."
Bulk Wine Storage - Terry - Perth
"Shrinkage was a huge issue and this has helped reduce the problem. Great system, produce is looking and is much fresher."
IGA Doubleview - WA
"We installed a CoolMist® system in January 2006. Since installation our shrinkage has reduced by 30%."
IGA Nedlands Perth WA (formerly Dewsons)
"A $800-$900 saving a week across the board for our Fruit and Veg since CoolMist® has been installed. Exceptional for our leafy lines. This represents a 600% ROI in the first 12 months."
IGA South Perth WA
"We thank you for your invaluable contribution to the successful outcome for the timber track installation at the Queensland State velodrome project for the 2018 Commonwealth Games. The humidification system as noted previously was a great success and acknowledged by all involved."
Jeff Bennett, Project Manager
Schedule a consultation with us now
We love working with businesses to solve their cooling, humidification and dust suppressions problems. Contact us about organising a consultation.